Page 14 - ATEN Office Desktop Solutions Guide
P. 14
Challenges The ATEN Solution
• Required easy switching among multiple source The ATEN DisplayPort KVMP solution allowed the
computers production designers to effortlessly work in true 4K
quality, switch among multiple content sources,
• Required superior 4K video quality with resolutions up
to 4K UHD and 4K DCI multitask at their desktop consoles and gain
super-speed access to peripheral devices, while also
• Need large bandwidth and extreme transmission providing independent switching of the KVM and USB
speeds to deal with accessing and delivering huge files peripheral focus.
• Easily connect the laptops of freelance designers and
clients to gain full access to system resources
CS1922M CS1942DP
2-Port USB 3.0 4K DisplayPort MST KVMP Switch 2-Port USB 3.0 4K DisplayPort Dual Display KVMP Switch
™
™
03
Post Production
Desktop KVM solutions are a highly effective way to optimize workflow in post production and graphic design environments. Post
production was among the first work environments in which a multiple-screen display was implemented, due to the large amount
of complex content that needed to be viewed at once to be manipulated effectively. In addition, work in these areas requires precise
video clarity and large data transfer rates. In order to effectively manipulate a variety of content at one time, post production
engineers require KVM switches that are compatible with the most up-to-date display standards, offer seamless control of multiple
computers, and allow high-speed access to a wide range of peripherals.
Multimedia Editing and Design Studio
A multimedia editing and design studio was looking to update its lab with a future-proof, scalable solution to provide high-performance
digital display connectivity for the production of multimedia and graphic content. The lab features high-end, integrated hardware and
software to augment the creation and editing of graphics, web pages, video and 3D. Production tools used by the designers include
4K-enabled PCs, industry standard software suites, and specialized peripherals, such as drawing tablets and integrated network data
storage, so high speed data transfer was crucial. The studio also wanted the flexibility to implement dual 2K and dual 4K workstations.
11 12